CPI / PermaASME PCC-2Heat Exchanger Tube Plug

Pop-A-Plug® CPI/Perma Tube Plugs

Weld-free mechanical tube plug with a helium-tight metal-to-metal seal.

A hydraulically installed mechanical tube plug that seals leaking heat exchanger and condenser tubes with a helium-leak-tight metal-to-metal seal, with no welding or explosives.

Key Features
  • Metal-to-metal helium-tight seal
  • No welding or explosives
  • ASME PCC-2 recommended method
  • Installs in seconds with a Pop-A-Plug ram
Industries
Oil & GasPetrochemicalPower GenerationWater TreatmentFertilizers
Specifications
Rated Pressure1,000 PsiG (68.9 BarG)
Tube ID Range0.472" to 2.067"
SealMetal-to-metal, helium leak-tight
StandardASME PCC-2 method

Specifications transcribed from the manufacturer datasheet. Confirm final selection with the product catalog or on request.

Product Videos

From Curtiss-Wright’s official YouTube channel.

EST Group: Pop-A-Plug® Tube Plugging System

Through-The-Tube Plugging™

Product Overview: Pop-A-Plug® Tube Plugging System

Pop-A-Plug® Heat Exchanger Tube Plugging: Introduction

Pop-A-Plug® Heat Exchanger Tube Plug

Pop-A-Plug® Installation, 6,000 PsiG Test and Removal

Documentation
LiteratureMK0003

Pop-A-Plug CPI Perma Plug Literature

Product literature, technical brief or application sheet.

LiteratureMK0004

Pop-A-Plug CPI Perma Tube Plug Tech Brief

Product literature, technical brief or application sheet.

ProcedureDC1220

Installation Procedure Pop-A-Plug CPI Perma Near End

Operating, installation or technical specification document.

ProcedureDC1220

Procedimiento Para La Instalacion De Pop-A-Plug® CPI Perma™ En La Placa Tubular Cercana (instalacion estandar)

Operating, installation or technical specification document.

ProcedureDC1222

Titanium Size Ranges CPI Perma

Operating, installation or technical specification document.

ProcedureDC4015

Through The Tube Installation Procedures CPI Perma

Operating, installation or technical specification document.

ProcedureDC9678

Operating Procedures Close Quarters Ram CPI Perma

Operating, installation or technical specification document.

Need a Pop-A-Plug® for your project?

Send us your requirement and one of our application engineers will follow up, typically within 24 hours.