P2ASME PCC-2Heat Exchanger Tube Plug

Pop-A-Plug® P2 High Pressure Tube Plugs

Leak-tight at supercritical pressures, under extreme thermal and pressure cycling.

When pressures reach supercritical levels, there is nothing like the Pop-A-Plug Tube Plugging System. A proven long-term performer in fossil and nuclear stations and many other high pressure applications, P2 Tube Plugs are designed to maintain a leak-tight seal under extreme thermal and pressure cycling. Each kit holds ten Pop-A-Plugs, a tube preparation brush and a Go/No-Go gage.

ACTS is Pop-A-Plug® & GripTight®’s sole agent in Egypt, supplying the Pop-A-Plug® P2 High Pressure Tube Plugs to oil & gas, petrochemical and power generation plants nationwide from our office in Sheikh Zayed City, Giza. Sizing and selection are handled by our own application engineers, with aftermarket support and technical services once the unit is in service.

Key Features
  • ASME PCC-2 and EPRI compliant; NUPIC certified
  • QA compliant to ANSI N45.2, NQA-1, 10 CFR 50 Appx. B and 10 CFR 21
  • Permanent solution with the lowest lifecycle cost
  • Certificate of Test & Inspection in every kit
  • Removable prior to retubing
Specifications
Pressure RatingUp to 7,000 PsiG (483 BarG); higher on request
Size Range0.400" to 1.460" (10.16 to 37.08 mm) tube ID
Kit10 plugs, tube preparation brush, Go/No-Go gage
QualityISO 9001:2015 registered facility

Specifications transcribed from the manufacturer datasheet. Confirm final selection with the product catalog or on request.

Product Videos

From Curtiss-Wright’s official YouTube channel.

Installation Training: Pop-A-Plug P2 Heat Exchanger Tube Plugging System

Ream, Brush and Install: Pop-A-Plug® P2

Pop-A-Plug® Tapered Reamer: Weld Droop Removal

Pop-A-Plug® Tube Preparation Brush

Documentation

Documentation on request

Product-specific literature for the Pop-A-Plug® P2 High Pressure Tube Plugs is available on request, or browse the Engineering Resource Center.

Browse Resource Center

Need a Pop-A-Plug® for your project?

Sized, quoted, and answered by an engineer

Send us your requirement and one of our application engineers will follow up, typically within one business day.